My ESting meets the requirements for the brief as it is will be 10 seconds long, will use the soundtrack and will contain the E4 logo throughout the shots. My ideas were originally to have the Lego character going through many different scenes and settings and have him making his way towards a party where it ends on a strobe light flashing on the E4 logo. This will have to be changed as it all will have to fit into the space of 10 seconds, it means that i wont be able to fit all of the shots in which I had planned, as instead I will only use a couple of my setting ideas. I had to make sure that when I am animating, the soft boxes that I was using were stable and dont have any cable hanging in the ways of where I will be walking, otherwise it could be a trip hazard. I will also have to make sure that I don't let the green screen touch the floor in front of me and instead just have it hanging off of the table. This meant that I will not have that trip hazard to worry about. I had to check that the pictures with backgrounds that I used were royalty free and are fine to use for my backdrops. I am the only one in my team which means that I will have to do all of the work myself. I will control the amount of frames per second (12fps), do all of the editing and visual work. I will to think of all of the shots, complete all the pre production paperwork. I haveto do every role that was needed throughout this production. I have completed all necessary paperwork below and the production will take place throughout the week after planning all of the ideas and doing all pre production. The deadline for this production will be set for the week after we begin filming and editing.
No comments:
Post a Comment